Not to be missed! We got an excellent presentation by John Austin on our wastewater treatment facility at the October 21 Basin Management Committee Meeting. Here is a link:
On a practical note, we have a 99.2% rate of connections, which means practically everyone required to has hooked up, just 44 properties left to go!
You can hear the Zoom meeting and Mr. Austin giving his report off of this link:
Astoundingly, our nitrates are very much below the 7mg/l limit! Listen to the details on the problem with the Bayridge delivery pipe and the draining of one of the LOWWTP ponds.
Happy learning!