It started with the pot holing.
Then the street was unzipped.
Water applied at every step to keep down the dust.
Electrical wires lifted out of the way.
Coming up the hill.
Digging sand.
The point of digging, placing pipes. Rather a pretty color!
The trench boxes are moved around with surgical precision.
Tap, tap, tap. Then more digging inside the box.
Plates go down to keep the sand contained.
When the pipe is in the trench boxes come out.
Note the lift in the back, they are pretty heavy.
Plates arrive to cover the excavation.
Look to the upper left at the holiday appropriate antenna decor!
There is so much more to say about the mind boggling dexterity of the equipment operators. How they lift, trek, nudge and tap these giant hunks of steel as though they didn't weigh tons.
And the fantastic project coordination with the many steps that require perfect timing between the different parts of the team—the guys constantly measuring, guys cutting pipe, so as soon as the trench is ready, in goes the pipe, the street sweeping and watering both with the equipment and by hand, new water arriving via truck, two trucks lined up to keep the dirt coming up and away from the trench, the dirt coming back to go into the newly piped section, putting on the plates with some hot asphalt to keep them firmly in place. Today is Saturday and the watering trucks came twice (while I was paying attention).
I got nothing done Friday watching this oh, so, beautiful show.
No comments:
Post a Comment