Reference Documents

Wednesday, October 08, 2014

Video of Ox Ditch and Sewer Construction Pix!

Check out the Trib for video and an article on our wastewater treatment plant-in-the-making! If the oxidation ditch (or racetrack) container was complete, the interviewer and the interviewee would be standing in 12 turbulent feet of swirling water (2 feet per second) with floaters! Yikes.

There are also photos of the current construction.

http://www.sanluisobispo.com/2014/10/07/3284610_construction-underway-on-los-osos.html?sp=/99/100/&rh=1

No comments: