-
Submittal of bid opening report for Los Osos Valley Road Widening between Doris
Avenue and Pine Avenue in Los Osos, and to award the subject contract to R. Burke
Corporation, the lowest responsible bidder, in the amount of $203,698. District 2.
Reference Documents
Showing posts with label LOVR. Show all posts
Showing posts with label LOVR. Show all posts
Tuesday, September 17, 2013
BOS, 9-24-13 LOVR Road Widening Ahead
Friday, March 22, 2013
Dig LO Announces Part of LOVR Complete!
Good news from Dig Los Osos this evening! The sewer lines on Los Osos Valley Road from 9th Street to Alexander Avenue are finished! Please read about the details at this link:
http://www.diglososos.com/2013/03/22/portion-of-los-osos-valley-road-finished/
Granted, navigating around and through the construction areas takes patience. But the equipment and trenches will eventually vanish, leaving us with roads smoother than many of us have ever seen them and unhappy septic tank issues that will never again surface.
http://www.diglososos.com/2013/03/22/portion-of-los-osos-valley-road-finished/
Granted, navigating around and through the construction areas takes patience. But the equipment and trenches will eventually vanish, leaving us with roads smoother than many of us have ever seen them and unhappy septic tank issues that will never again surface.
Subscribe to:
Posts (Atom)